
Flamanville Nuclear Power Plant
Nuclear power plant in Manche, France

Nuclear power plant in Manche, France
The Flamanville Nuclear Power Plant is located at Flamanville, Manche, France on the Cotentin Peninsula. The power plant houses three pressurized water reactors (PWRs). Units 1 and 2, rated at 1.33 GWe net each and based on a Westinghouse design, were ordered following the Messmer Plan and deliver full power since 1987. Unit 3 is an EPR unit with a nameplate capacity of 1.65 GWe which was connected to the grid in December 2024 and reached full power in December 2025. The power plant produced 18.9 TWh of energy in 2005, which amounted to 4% of the electricity production in France. In 2006 there were 671 workers regularly working at the plant. In 2023, 11,7 TWh was produced with 1400 regular workers. Construction of unit 3 began in 2007 with its commercial introduction scheduled for 2012. Areva, the company in charge of the project, proved unable to manage it (just like Olkiluoto 3), leading to the ultimate demise of the company. Various safety problems have been raised, including weakness...
Read on Wikipedia · Image JKremona, CC BY-SA 4.0
Open boosters, collect cards and trade them. Free to play.
Play for free