
Shippingport Atomic Power Station
United States atomic electricity plant (1957–1982)

United States atomic electricity plant (1957–1982)
The Shippingport Atomic Power Station was (according to the US Nuclear Regulatory Commission) the world's first full-scale atomic electric power plant devoted exclusively to peacetime uses. It was located near the later Beaver Valley Nuclear Generating Station on the Ohio River in Beaver County, Pennsylvania, United States, about 25 miles (40 km) from Pittsburgh. The reactor reached criticality on December 2, 1957, and aside from stoppages for three core changes, it remained in operation until October 1982. The first electrical power was produced on December 18, 1957, as engineers synchronized the plant with the distribution grid of Duquesne Light Company. The first core used at Shippingport originated from a cancelled nuclear-powered aircraft carrier and used highly enriched uranium (93% U-235) as "seed" fuel surrounded by a "blanket" of natural U-238, in a so-called seed-and-blanket design; in the first reactor about half the power came from the seed. The first Shippingport core reactor...
Read on Wikipedia · Image Public domain
Open boosters, collect cards and trade them. Free to play.
Play for free