
Panama Canal expansion project
2007–16 construction of larger locks on Panama Canal

2007–16 construction of larger locks on Panama Canal
The Panama Canal expansion project (Spanish: ampliación del Canal de Panamá), also called the Third Set of Locks Project, doubled the capacity of the Panama Canal by adding a new traffic lane, enabling more ships to transit the waterway, and increasing the width and depth of the lanes and locks, allowing larger ships to pass. The new ships, called New Panamax, are about one and a half times larger than the previous Panamax size and can carry over twice as much cargo. The expanded canal began commercial operation on 26 June 2016. The project has: Built two new sets of locks, one each on the Atlantic and Pacific sides, and excavated new channels to the new locks Widened and deepened existing channels Raised the maximum operating water level of Gatun Lake Then-Panamanian President Martín Torrijos formally proposed the project on 24 April 2006, saying it would transform Panama into a First World country. A national referendum approved the proposal by a 76.8 percent majority on 22 October the...
Read on Wikipedia · Image Mariordo (Mario Roberto Durán Ortiz), CC BY-SA 4.0
Open boosters, collect cards and trade them. Free to play.
Play for free