
I-395 Signature Bridge
Ongoing construction project

Ongoing construction project
The Interstate-395 Signature Overpass (also referred to as The Fountain) is an ongoing construction project on the I-395/SR-836/I-95 Midtown Interchange in downtown Miami, Florida. The overpass was designed by Donald MacDonald architects, led by the Archer-Western-de Moya Group. The Florida Department of Transportation (FDOT) and Miami-Dade Expressway Authority are the current overseers of the project. The overpass spans 1025 feet (312 meters), with a maximum arch height reaching 325 feet (99 meters) and maximum span length reaching 650 feet (198 meters). The construction project began in 2016 and was intended to be completed in 2021, but setbacks moved the expected completion date to 2024, then 2027, then further to 2029. The Fountain aspect of the overpass intends to stand as a landmark for passersby visible from the Port of Miami, while the overpass additionally serves as an emergency evacuation route from Miami Beach. The wider project, known as Connecting Miami, also includes double...
Read on Wikipedia · Image Feldmjm1, CC0
Open boosters, collect cards and trade them. Free to play.
Play for free